LocalBallotBook Logo
Current Section
Summary
Menu

Napa Valley Unified
Unified School District

No matching results

Loading...

Year:
Help

November 08, 2022

Measure A1
Fail
GO Bond Education Threshold: Fifty-five
To upgrade Napa schools to meet safety/academic standards, fix deteriorating roofs, plumbing/ electrical systems, remove hazardous materials including asbestos/ lead pipes; construct, repair, upgrade, and acquire classrooms, labs, facilities/equipment to support student achievement in science, math, technology, and skilled trades, shall Napa Valley Unified School District School Facilities Improvement District No. 1 (Napa Area)’s measure authorizing $200,000,000 in bonds at legal rates be adopted, levying 2¢/$100 assessed value ($14,000,000 annually) while bonds are outstanding, with independent citizen oversight and all money staying in Napa?
Option Votes Percentage
Yes
~XX,XXX ~XX%
No
~XX,XXX ~XX%
Total Votes ~XX,XXX
Measure A2
Pass
GO Bond Education Threshold: Fifty-five
To provide classrooms, facilities and technology to support instruction in math, science/ engineering, fix roofs, plumbing/ electrical systems, construct, repair, upgrade/ acquire classrooms, facilities, equipment, provide labs/equipment for career and technology classes to prepare students for college and in-demand jobs, shall Napa Valley Unified School District School Facilities Improvement District No. 2 (American Canyon Area)’s measure authorizing $25,000,000 in bonds at legal rates be adopted, levying 2¢/$100 assessed value ($2,000,000 annually) while bonds are outstanding, with independent citizen oversight and all money staying in American Canyon?
Option Votes Percentage
Yes
~X,XXX ~XX%
No
~X,XXX ~XX%
Total Votes ~X,XXX